Proyek teraso Stasiun Kereta Api Jiaxing
Jiaxing Railway Station-A Station in the Forest
Project Information
Project Name: Jiaxing Railway Station-A Station in the Forest
Project materials: Winter Snow Terrazzo
Project appliacation: Floor
Stone supplier: Dongxing Group
01/
Jiaxing Railway Station gets a
Jiaxing’s “Train Station in the Forest” was renovated and designed by the famous designer Ma Yansong and his team, and was constructed by China
Railway Construction Engineering Group. Made by Dongxing Group.As the main material supplier for this project, we have ingeniously provided
project modules such as the main body of the railway station - the north and south station waiting halls and their main passages.
It is reported that the newly built north and south station buildings of Jiaxing Station use a large number of minimalist and modern green,
low-carbon and environmentally friendly materials. Dongxing inorganic terrazzo, with its high-quality, intelligent manufacturing, deep processing
technology and green and environmentally friendly characteristics, satisfies the designer's expectations for future urban transportation building
space. The comprehensive needs of use function, space technology, architectural art, and ecological aesthetics.
The interactive design of terrazzo and light and shadow in the waiting halls of the north and south station buildings of the railway station and its
entry passages presents the ultimate sense of the future. The inorganic terrazzo customized by Dongxing for this railway station in the forest is
called
02/
Jiaxing railway station project tackles difficulties
The Dongxing team is guided by party building, works together with ingenuity, and achieves great results repeatedly. The Jiaxing Railway Station
that is about to be opened to traffic and the Jiaxing Party and Mass Service Center that is about to open are witnesses of the masterpieces of
the times created by Dongxing Group with its hard work and wisdom!
There are more than 2,000 specifications of inorganic terrazzo, including more than 960 specifications of special-shaped parts distributed in axle
beams, air vents, beams, columns, tails, channels, etc. There are many super-large arc plates, super-large double curves...the processing is
extremely difficult. Hard to imagine.From the front line of processing to the front end of the project, in every link, every process, and every component,
the Dongxing team follows the company's
03/
Railway station in the forest:
Green Development and Environmental Protection Practice
The upgraded and renovated Jiaxing Railway Station will not only become a red link connecting the century-old history, but is also known as
the
Jiaxing Forest Railway Station, which implements the concept of green development in an all-round way, is very consistent with Dongxing
Inorganic Terrazzo, which pursues
Dongxing Group seizes the opportunity and focuses on layout and services in the field of transportation hubs. As always, it adheres to the
green/low-carbon/environmental-friendly
comfortable, environmentally friendly, and excellent-performance products. green product.
A century-old station, let’s start again
Dongxing craftsmen, forge ahead together!